The scope of the activity is the development of the Front End Engineering Design (FEED) and the preparation of the EPC tender for the second HVAC electrical interconnection system between Italy (Sicily Island) and the island of Malta with a power capacity of 225 MW.
The scope of the project is to carry out a Master Development Plan of the electricity networks of West Bank that addresses all aspects concerning the long-term or strategic planning, meeting the power demand for the socio-economic development of the country.
In the last few years Lithuanian government set up a program to synchronize local power system with Continental Europe power system (Continental Europe Synchronous Area, CESA) and to ensure at the same time an increase in system inertia for strengthening the grid.
CESI has been selected by NTDC, the Pakistani TSO, to carry out a study for reviewing the national grid system performance and for proposing system stability improvements.
The Georgian transmission network operator, Georgian State Electrosystem (GSE), has a ten-year network development plan for 2020-2030, which is aimed to further improve electricity supply reliability in the country and regional connectivity of the Georgian power system.
Since the construction start date of the CASA-1000 Power Transmission Project, substantial implementation and construction activities have been undertaken so that CASA-1000 facilities can be available for commissioning and start-up by the project’s commercial operations date
System studies for the review of the grid system performance and proposals for system stability improvement under Pakistan National Power Transmission Modernization Phase 1 Project