The scope of the activity is the development of the Front End Engineering Design (FEED) and the preparation of the EPC tender for the second HVAC electrical interconnection system between Italy (Sicily Island) and the island of Malta with a power capacity of 225 MW. The power infrastructure consists of a 220 kV 118 km submarine power link, the onshore connections 19 km and 2 km long in Italy and Malta respectively and the upgrade of the terminal stations in Italy (Ragusa) and Malta (Maghtab).
The project consists of three main tasks: