Environmental activities for Tarapacá Thermoelectric Power Plant

CESI has carried out, for a thermoelectric plant owned by ENEL Generación Chile, a series of environmental activities within the scope of the decarbonization plan implemented in the Chilean energy matrix.

The plant, located in the northern part of the country, ceased its electricity generation activity and was disconnected from the national electricity system at the end of 2019.

In detail, CESI developed the following activities:

  • plant area soil, groundwater and marine sediment characterization
  • coal storage field soil characterization
  • ash dump soil and groundwater characterization
  • environmental risk assessment
  • ecological receptors risk assessment
  • remediation plan
  • ash dump closure project detailed engineering

Area Manager
Info
YEAR
2020 - ongoing
Country
Chile
Services
Energy
Environment
Environmental Site assessment & Feasibility Studies
Environmental studies
Remediation project
Industries Expertise
Conventional Power Plants
Power Plants
For info