Soil, groundwater and sediment analysis and design of remediation project at Alanno dam area for Enel green Power
CESI was selected by Italy’s main dam operator to carry out remediation activities. The client needed to verify the status of its sites located in Bussi (a site of national significance) by carrying out surveys for contamination of topsoil, subsoil, groundwater, surface water and sediment around the Alanno dam’s reservoir and the related water pick-up and return. CESI designed investigation plans, helping the client to implement prevention measures after an Environmental Impact Assessment and a health and environmental risk analysis showed there were no ecological risks.