Defence and restoration plan for Senegal high voltage network In recent years, Senegal’s network has faced a resurgence of blackouts that can lead to the collapse of all or part of the network, despite the introduction of forecasting and real-time management by SENELEC, the national TSO, to enhance the operational safety of its electrical system. […]
Continuous maintenance, updating and verification of Italy’s power network restoration plan. Following a blackout in 2003, Terna reviewed its strategies for restoring power, after carrying out in-depth static, dynamic and electromagnetic analyses. CESI was selected as technical consultant for the project. Terna reviewed all its power restoration strategies as a national and regional priority and […]
Feasibility study for a 500kV electrical interconnection and energy trading between Arab countries The Arab League developed a master plan for electric power interconnection and power trading among Arab countries. The study, funded by the Arab Fund for Economic & Social Development, aimed to investigate ways to maximise the benefits of an integrated Arab electrical […]
20-year expansion plan study of the Bolivian electric system CESI won an international tender to develop a study of how to expand generation, transmission and distribution capacity in Bolivia over a 20-year time horizon. The study required proposals that met the requirements of the Interconnected National System (SIN), of the islanded systems to be incorporated […]
Interconnection study of the Algerian Adrar-in Salah network into the Northern interconnected network, including the integration of renewable energies. In its renewable energy development programme for 2015-2030, the Algerian government planned to install up to 4,500 MW of renewable energy capacity, mainly wind and solar PV. The country already has considerable renewable energy capacity integrated […]
System studies for the review of the grid system performance and proposals for system stability improvement under Pakistan National Power Transmission Modernization Phase 1 Project