Top Job Logo

News

CESI Selected for Feasibility Study of Fourth Estonia–Latvia Electricity Interconnection
News
03 . 11 . 2025
CESI Selected for Feasibility Study of Fourth Estonia–Latvia Electricity Interconnection
In a significant step forward for Baltic-region energy integration and the green transition, the Latvian transmission system operator AS Augstsprieguma tīkls (AST) and the Estonian counterpart Elering AS have launched a joint feasibility study for a fourth electricity interconnection between Estonia and Latvia. The proposed interconnection is planned as an offshore/hybrid project in the Baltic […]
Read More
Grid flexibility and RES integration
News
14 . 09 . 2022
Grid flexibility and RES integration
Through the Flex Power Grid Laboratory in Arnhem, The Netherlands, KEMA Labs (our Testing, Inspection and Certification Division) offers system-level battery testing
Read More