In a significant step forward for Baltic-region energy integration and the green transition, the Latvian transmission system operator AS Augstsprieguma tīkls (AST) and the Estonian counterpart Elering AS have launched a joint feasibility study for a fourth electricity interconnection between Estonia and Latvia. The proposed interconnection is planned as an offshore/hybrid project in the Baltic […]
Through the Flex Power Grid Laboratory in Arnhem, The Netherlands, KEMA Labs (our Testing, Inspection and Certification Division) offers system-level battery testing