Top Job Logo

analisi manutenzione manufatti civili

Technical papers
Optimizing the electrical design of the Colombia-Panamá interconnection
​The interconnection between Colombia and Panamá has been the object, since 2003, of a series of feasibility studies, cooperation agreements and financing approaches for a project which is intended to be a great contributor to the electrical markets integration of the Andean and Central America regions. Both countries have confirmed their interest in developing a […]
Technical papers
The restoration strategies from neighbouring countries: simulation studies and actual tests experience
The paper describes the preparation and execution of Switzerland Italy re-energization test, managed on 2013, 6th January in order to continuously improve the restoration strategies to and ensure a constant assessment of ENTSO-E Operation Handbook (policy 5) procedures. The paper firstly summarizes the main results of the theoretical investigations on different neighbour backbones. Secondly the […]
Technical papers
Market integration and storage resources optimization to mitigate the risks of “over-generation” from non-programmable RES: the Italian prospective
​Italy has witnessed a very massive penetration of photovoltaic and wind generation in the recent years. The largest share of wind plants is connected to the transmission grid and the total power installed exceeded 8.5 GW at the end of 2013. Photovoltaic plants are generally connected to the distribution grid and at the end of […]