800MW+ Battery energy storage systems – environmental authorisation procedure for 4 projects – environmental permitting, environmental impact assessment, landscape report, suitability assessment, Archaeological Report, for Enel. Enel selected CESI to provide preliminary environmental impact assessments and landscape assessments for the development of several battery energy storage systems in Italy. The systems have an overall capacity […]
3GW+ coal to gas power plant conversion – environmental impact assessment, landscape report, suitability assessment, archaeological report, for Enel. Enel asked CESI to provide support for the transition of Italy’s electricity sector from coal to gas and the development of a capacity market. CESI worked with Enel to develop environmental impact assessments for several coal-to-gas […]
Malta-Italy gas pipeline interconnection – environmental impact assessment and Unitary Authority for Energy & Water – Government of Malta. CESI, together with VDP and AIS Engineering, was selected by Malta’s Ministry for Energy and Water Management (MEW) to carry out the Permitting & Environmental Impact Statement of the Malta-Italy Pipeline Interconnection. This will connect Malta […]
EuroAsia 2000MW HVDC interconnection – EIA transboundary procedure and feasibility study for HVDC submarine interconnector between Greece and Israel via Cyprus CESI was selected to conduct the National and Transboundary Environmental Impact Studies (EIA) for the EuroAsia project, part of the European Union’s “Energy Priority Corridor 3” project under the Connecting Europe Facility (CEF) Energy […]
Italy | Permitting | Conventional Power Plants
Integrated environmental authorization
Integrated environmental authorization for 1.1GW Tavazzano e Montanaso gas-fired power plant for EP production.