The scope of the activity is the development of the Front End Engineering Design (FEED) and the preparation of the EPC tender for the second HVAC electrical interconnection system between Italy (Sicily Island) and the island of Malta with a power capacity of 225 MW.
Malta-Italy gas pipeline interconnection – environmental impact assessment and Unitary Authority for Energy & Water – Government of Malta. CESI, together with VDP and AIS Engineering, was selected by Malta’s Ministry for Energy and Water Management (MEW) to carry out the Permitting & Environmental Impact Statement of the Malta-Italy Pipeline Interconnection. This will connect Malta […]