Digital Star

Projects

Our expertise reaches almost every corner of the energy sector
Filter By
Italy | Permitting | Other RES
Monterotondo geothermal power plant
20MW Monterotondo geothermal power plant – environmental impact assessment, landscape report, appropriate assessment, archaeological report for Enel Green Power.
Italy | Switzerland | Permitting | HVAC | HVDC
Switzerland – Italy Interconnector/GF
Switzerland – Italy Interconnector HVDC/HVAC 132kV OH Line – environmental permitting, environmental impact assessment, landscape report, for GreenConnector.
Italy | Permitting | Conventional PP
Integrated environmental authorization
Integrated environmental authorization for 5GW+ power plants, for Enel.
Italy | Permitting | Conventional PP | Wind
More than 60 permitting procedures..
More than 60 permitting procedures in Italy over the last 10 years.
Italy | Permitting | Distribution Infrastructures
Line Fossano-Magliano Alpi – environmental activities
132kV OH Line Fossano-Magliano Alpi – environmental permitting, environmental impact assessment, landscape report, suitability assessment, archaeological report, for Terna Rete Italia.
Italy | Permitting | Other RES
Triana geothermal power plant
20MW Triana geothermal power plant, environmental impact assessment, landscape report, suitability assessment, archaeological report, for Enel Green Power.