The scope of the activity is the development of the Front End Engineering Design (FEED) and the preparation of the EPC tender for the second HVAC electrical interconnection system between Italy (Sicily Island) and the island of Malta with a power capacity of 225 MW.
Repowering wind farms to install 72 MW of capacity for Italian wind power company ERG Power Generation hired CESI to provide the final design for repowering two wind farms with a total capacity of 37.26 MW, provided by 53 sub-1 MW turbines. The windfarms are located in the Apennines, some kilometers away from a number […]
Integrated environmental authorization for 5GW+ power plants, for Enel. The Tavazzano e Montanaso Power plant is a 1.1GW natural gas fired power plant with two CCGT (combined cycle gas turbine) units with three turbines. Since 2010 CESI has supported EP Produzione with its work on the integrated environmental authorisation (IEA) of one of the biggest […]
Switzerland – Italy Interconnector HVDC/HVAC 132kV OH Line – environmental permitting, environmental impact assessment, landscape report, for GreenConnector. Terna Rete Italia is implementing urgent measures to guarantee the security of electricity supply to major islanded communities. Terna, together with neighbouring grid operators, investigated the possibility of setting up new electricity corridors of common interest. Terna […]
20MW Monterotondo geothermal power plant – environmental impact assessment, landscape report, appropriate assessment, archaeological report for Enel Green Power. Enel Green Power sought CESI’s support for its environmental impact assessment for its 20MW Monterotondo geothermal power plant in the Monte Amiata region of Tuscany. The project involves building an open cycle geothermal power plant and […]