Client
European Commission - EU 5th Framework Program
Period
  2,002 - 2,005

Client Challenge

The DISPOWER project was intended to support the transition of energy supply towards a more decentralized and market oriented supply structure.

What we have done

A distributed generation (DG) test facility has been installed at the CESI's plant in Milan. It has been used for:

  • Characterizing, testing and evaluating the performance of interconnected distributed resources.
  • Evaluating the grid-connected or stand-alone use,
  • Adopting different possibilities for DG sources organized in a micro-grid configuration.

CESI, as a WP Leader for the overall assessment of DG in local power supply system, verified the impact of power generators distributed in low voltage grid segments and define technical measures for optimum utilization of distributed power generators.​​