Client Challenge

Following the acquisition of existing Hydroelectric Power Plant, the Client has to assess the safety and structural stability of dam, in compliance with local regulation, in order to plan the O&M and to design the development plan of the power plants.

What we have done

  • Site visit and emergency works assessment
  • Preliminary risk classification
  • Hydrological studies/ extreme floods calculation
  • Topographic/ topobathimetric surveys
  • Geotechnical surveys
  • Dam break - hydrodynamic simulation
  • Dam break -potential hazard prone zoning
  • Assessment of foundation conditions/ Dam stability
  • Dam risk determination
  • Operation, maintenance, monitoring and inspection manual
  • Feasibility of the performance improvement related to some Power Plant
  • Emergency Actions Plan
  • Final report of dam safety

Client Benefits

  • The dam safety assessment in compliance with local regulation
  • The functionality analysis of hydroelectric plants
  • The feasibility study of the performance improvement related to some Power Plant
  • The improvement of the Dam safety operations, by personnel involvement, to reduce the vulnerability of the plant during operation and emergency situation (floods)