Skip Ribbon Commands Skip to main content
SEARCH OPTIONS
From / To
Region
Country
Service
SubService
Sector
Client

Project Data

Client
TERNA
Region / Country
EUROPE /Italy; Montenegro
Period
  2,008 - 2,009

Client Challenge

The evaluation of the impact of the new link on the Italian electric grid, then defining the most attractive size consistent with the transfer capacity of the system and the security margins.

What we have done

CESI performed the following activities:

  • Execution of a preliminary simplified scenario analysis (possible location of converter stations and cable routes),
  • Based on the preliminary analysis results, selection of the two most interesting alternatives,
  • Analysis and description in detail of the selected solutions,
  • Technical Assistance for the Functional Specification of the selected solution.

CHIARA CECCHETTI
Phone: +39 022125.5211

SOCIAL MEDIA

Follow us on

Share on